City permit guide · CO

EV charger permits in Fort Collins, CO

Fort Collins Building Services has an EV charging handout for existing buildings and public/commercial accessibility scenarios. For a home charger, the important local signal is that EV Charging Station is a specific permit/record attribute in the city permit system.

Quick answer for Fort Collins, CO

  • A new Level 2 home EV charger circuit generally requires an electrical permit in Fort Collins, CO.
  • Permit path: Building/electrical permit for EV charging stations at existing buildings.
  • Typical fee guidance: Per Fort Collins fee schedule and Accela Citizen Access invoice..
  • Timeline: Permit timing depends on scope and whether the work is residential only or includes parking/accessibility review.

Official source: Fort Collins Building Services EV charging / permit materials

Permit required Yes — new 240V circuit
Permit type Building/electrical permit for EV charging stations at existing buildings
Typical fee Per Fort Collins fee schedule and Accela Citizen Access invoice.
Apply online Yes · Portal

The process

How it works in Fort Collins, CO

Permit office: Fort Collins Building Services.

Who can pull the permit: Licensed contractors or qualifying owner-occupants use the Fort Collins Citizen Access process; contractor and owner-affidavit requirements depend on scope..

Plan review: Residential charger work may be a building/electrical permit depending on scope. Existing-building EV chargers at commercial/multifamily sites must address accessibility options and current NEC/building code.

Typical timeline: Permit timing depends on scope and whether the work is residential only or includes parking/accessibility review.

Bring these

Documents you'll need

  • Charger manufacturer spec sheet showing listing, amperage, connector, and hardwired vs plug-in configuration
  • Panel photo and breaker directory, plus proposed breaker size and charging load
  • Simple site sketch showing the electrical panel, wire route, charger location, and parking space served
  • Load calculation when the service is small, the circuit is 40A or larger, or a panel upgrade may be needed
  • Permit application showing EV Charging Station scope
  • Accessibility/parking details for non-single-family sites

Final step

Inspection notes

Keep the permit, charger specs, and any approved plans on site. Existing parking-area installs may be inspected for accessibility and signage in addition to electrical code.

Verified against Fort Collins Building Services EV charging / permit materials on July 4, 2026. Use the linked official source because fees, portal labels, and inspection procedures can change.

Electrical work can be dangerous and is regulated by code. This page is educational, not electrical or engineering advice. Hire a licensed electrician and follow your local permitting process.

Find licensed electricians in Fort Collins, CO

Ask each bidder to include the permit and inspection in the quoted price — then compare like for like.

Finding an installer yourself: ask for the contractor's state license number, proof of insurance, and at least two recent Level 2 installs. Get the permit number in writing.

Use the free permit checklist

FAQ

Fort Collins, CO permit FAQ

Do I need a permit for a Level 2 EV charger in Fort Collins?

Yes. A new 240V Level 2 charger circuit is electrical work and should be permitted through Fort Collins Building Services. The local path is: Building/electrical permit for EV charging stations at existing buildings.

Who should pull the EV charger permit in Fort Collins?

Licensed contractors or qualifying owner-occupants use the Fort Collins Citizen Access process; contractor and owner-affidavit requirements depend on scope.

How long does the Fort Collins EV charger permit take?

Permit timing depends on scope and whether the work is residential only or includes parking/accessibility review.